Sullair 1300 cfm / 350 – 500 psi 2 stage air compressor (Rebuilt with 0 Hours with new clutch, oil changed every 100 hours)
53' ft H 130,000 lbs TeleScoping Tower (Handles Range 3 Casing), 4-Sheave Crown, 34,600 lbs Pulldown Cap, Single Rod Carrousel, 3" inch Standpipe & Rotary Hose, 20" inch Full Open Hydraulic Table
Funk Box In&Out
Mounted on a CCC (Crane Carrier Company) Truck with 5-Axle 8x8 Truck -
About 3000' ft of (30' x 4-1/2") drill pipe (pressure tested)
4 drill collars
2 Numa hammers (one P120 & one N 100) with 14 inch bits – low hour with 1 new bit still in the crate
Several cross over subs for making pipe and collars up to 4-½ & 6-5/8 bits
Collar handling tools – we made up a set of lift nubbins, links and tubing elevators so the collars can be picked up and laid down safely – ($9800 value)
2 cat walks that are 20' ft that pin together to run range 3 pipe and are easy to move
4 pipe racks
Lay down cable for catwalks – so you can lay pipe down with the rotary head
V door
Casing structure that sets on the floor so casing crew has a safe platform to work
New working floor
New drillers stand with stairs
Deck catwalks with handrails and stairs the match up to the sub
Paint in Very Good Condition
Several tools made such as a joint of pipe and sub with a 17-½ inch bit to drill conductor casing (with this you don’t have to break a bit out) and a joint made up with a bit to drill a rat hole so the collars can be set in the hole with the lift nubbins safely